Redevelopment of the Millet Intake and Raw Water Pipeline within the John Compton Dam Water Supply System (St. Lucia)

The Department of Economic Development Transport and Civil Aviation now invites sealed bids from eligible bidders for the Redevelopment of the Millet Intake and Raw Water Pipeline within the John Compton Dam Water Supply System, Saint Lucia comprises the following:

  • reconstruction of existing weir including new water meter chamber;
  • supply and installation of approximately 3,300 metres of 450 mm diameter raw water transmission main including air release valve chambers;
  • construction of a cast in place reinforced water meter chamber (Junction Connection Chamber);
  • construction of a permanent access road adjacent to or within close proximity to proposed water transmission main; and
  • connection to the existing raw water transmission main(s)

A site visit will take place on October 19, 2020 starting at 10:00 a.m. at Millet. A pre-bid meeting shall take place on October 20, 2020. Bidders may engage in the pre-bid meeting via Zoom. The link to the Zoom online pre-bid meeting will be provided to those Bidders who obtained the bidding documents. Bidders are advised to visit the GOSL website at https://www.stlucia.org/en/covid-19/ for travel protocols to Saint Lucia.

Bids must be delivered on or before, November 11, 2020 at 9:30 a.m. (0930 hours on or before). Due to the COVID-19 pandemic Bidders may submit Bids electronically in the form of an encrypted or password­protected document to This email address is being protected from spambots. You need JavaScript enabled to view it.. In case of encrypted bids, the bidder should indicate that the Chairperson of the Central Tenders Board may open the bid and the "password key" for opening the bid. Bids cannot be opened before the time of bid submission and opening.

Read the entire Redevelopment of the Millet Intake and Raw Water Pipeline within the John Compton Dam Water Supply System (PDF, 49 KB) document.

Posted: 13/10/2020